日韩精品成人a在线观看-日韩精品成人免费观看-日韩精品成人在线-日韩精品大片-日韩精品第三页-日韩精品福利

Small meteorological station
Small meteorological station

Product Center

Contact Us

Shandong Wanxiang Environmental Technology Co., Ltd

contacts :Manager MAO

Telephone :15666889815

QQ:1950883583

Company Address:The second floor of the first accelerator of the Optoelectronic Industry Park, No. 155 Incubation Second Lane, High tech Zone, Weifang City, Shandong Province

Manual Lifting Movable Lightning Rod

Manual Lifting Movable Lightning Rod

update time :2025-09-05

Model:WX-SJ20A

Product Price: Electronic Negotiation

Product brand: Wanxiang Environment

Manual Lifting Movable Lightning Rod, also known as manual pre discharge lightning rod or movable lifting lightning rod, is a device used to protect buildings, tall trees, and other structures from lightning strikes. Installing a lightning arrester at the top of the protected object and connecting it to the underground drainage network using compliant wires can achieve lightning protection
product details

1. Scope of Use

The support for various wireless communication antennas, lighting lamps, cameras, night vision devices, ordinary lightning rods and other equipment. It is especially applicable to the installation and use of various instruments with strong mobility and frequent movement. Such as the installation and installation of satellite signal receiving antennas, mobile radar lightning rods, etc.

Second, applicable environment

Working temperature: electric type-45℃~+55℃, manual type ±55℃. Maximum wind resistance30m/s( installation is solid and the pull line is in the state), flat and solid frequently moving various instruments of installation and use. Such as the installation and installation of satellite signal receiving antenna, mobile radar lightning rod, etc. Solid ground (indoor, outdoor), vehicle, square warehouse inside and outside of the installation, ship, offshore drilling platform installation.

Three, Technical Parameters

<table border="1" cellspacing="0" font-size:12px;width:668px;border:none;"="" style="box-sizing: inherit;font-family: 'Helvetica Neue', Helvetica, 'PingFang SC', 'Hiragino Sans GB', 'Microsoft YaHei', Arial, sans-serif;font-size: medium;text-wrap: wrap">

Product specifications

10 meters

12 meters

15 meters

20 meters

30 meters

Expand height

10003mm

12000mm

15007mm

20000mm

30000mm

Closed height

2089mm

2200mm

2624mm

2700mm

3200mm

Group material

Magnesium alloy

Magnesium alloy

Magnesium alloy

Magnesium alloy

Four-key management

Product weight

40KG

50KG

60KG

61KG

120KG

Drive mode

Manual

Manual

Manual

Manual

Manual

Wind resistance level

8-10 level

8-10 level

8-10 level

8-10 level

8-10 level

Group color

Army green

Army green

Army green

Army green

Army green

Lightning rod

0.5m special alloy lightning rod tip

Stainless steel lightning rod

0.5m special alloy lightning rod tip

Stainless steel lightning rod

0.5m special alloy lightning rod tip

 IV. Selection Conditions

1.Determine the maximum lift, closing height, load weight, and windward area of the load

2.Determine ground mounting, exterior mounting, or interior mounting

3.Determine the vertical or horizontal type of the electric model

4.Determine the power supply for the electric motor

5. Structural characteristics and working principle

Compact structure, consisting of a lifting rod, tripod bracket, hand crank, cable system, etc. The power is transmitted by a hand-crank shaft, umbrella gear, screw rod, screw nut, and steel wire rope combination to achieve the lifting purpose.“Multi伸縮 mechanism”, that is, all sections of the movable rod are lifted and lowered simultaneously, fast speed, and the steel wire rope is exposed after lifting. It can be self-locked at any height position without sliding down.

Six, Construction Requirements

1.The lifting lightning rod must be installed on a flat, hard foundation to ensure that it does not sink or tilt under load.

2.The loading of the lifting lightning rod is not allowed to exceed the specified weight, the loading should act on the axis of the rod, asymmetric loading that causes the lifting lightning rod to tilt and bend is prohibited.

3.The lightning rod must be vertical to the horizontal plane, with a deviation of no more than0.5°.

4.When the wind speed exceeds14m/S, guy wires must be used for setting up or lifting.

5.The lifting rod must be removed before the lifting rod is raised.

6.The fasteners securing the fixed load must be tightened before lifting.

7.No bumping during use, installation or transportation to prevent deformation of the rod body.

8.In case of any abnormal phenomenon such as difficulty in lifting or sudden stop during the lifting process, the work should be stopped immediately, the cause should be found out, and the fault should be eliminated before proceeding.

9.Remember that during the lifting and lowering process, the three-layer lifting wire box of the fixed pipe must be in the locked state, see the detailed drawing of the locked state in Figure 1.

Seven, ground setting, lifting and guy wires

1.Choose a good flat, hard, open site, which can meet the requirements of the pull line driving the ground stake, that is, the site is a circle area greater than or equal toR=12.6m.

2.Refer to Figure 2 to install the upper hinge, bracket and diagonal brace rod to the lifting rod and then install the pin.

3.Set each pull rod lock of the pull rod box to the unlock state (i.e. pull up the lock rod handle and rotate90° to make the lock rod handle protrusion1 disengage from the lock body groove).

4.Hang the long, medium, and short pull line hooks of the pull line box on the upper, middle, and lower pull line holes of the lifting rod respectively.

5.Mount the load on the lifting rod and tighten the fixing screws and remove the closing lock hook.

6.Set up the lifting rod and hold it, then extend the outriggers, pull the telescopic rod lock outwards and pull the telescopic rod out to the position and lock it.

7.Place the foot support plate under the foot and rotate the adjusting bolt to fine-tune the foot so that all three legs support the load and the lifting rod is vertical.

8.With respect to the top of the lifting rod, the position of the pull line hole is such that, with the lifting rod as the center,12.6mis the radius for driving three ground nails into the ground with the ring of the ground nail facing the lifting rod.

9.Hang the hook of the three pull-line boxes on the three ground stake hanging rings respectively.

10.Adjust the short pull rod lock pin of the pull rod box to be in the locked state (i.e., pull up the lock pin handle and rotate90° to make the lock pin handle protrusion enter the lock body groove)Insert the pull rod box crank into the short pull rod box crank plug, rotate the pull rod box crank clockwise, and tighten the pull rod at the same time to fix the lifting rod in the vertical position.

11.Turn the hand crank counterclockwise to raise the lifting rod. Insert the hand crank into the hand crank shaft and turn it clockwise to evenly lift the lifting rod. During the lifting process, release the pull rope and assign a special person to observe the verticality of the lifting rod. Command the operator of the pull rope box to adjust the tension of the pull rope to keep the lifting rod vertical. When the lower part of the third section from the bottom is seen to be exposed or the hand crank feels immovable, the lifting rod has reached its maximum height.

12.Adjust the length and middle pull line box lock銷 to be in the locked state, insert the pull line box crank into the pull line box length and middle pull line crank hole respectively, rotate the pull line box crank clockwise and hear a "dong dong" sound, tighten the pull line at the same time, and fix the lifting rod in the vertical position.

8. Lowering and Disassembly

1.Slowly lower the lifting rod by turning the handwheel counterclockwise. The line box operator follows the line and

Observer command to adjust the pull line to keep the lifting rod vertical until the lifting rod is lowered into position.

2.Hold the lifting rod, remove the pull box from the ground stake and then retract the telescopic rod inward.

3.Remove the outrigger and diagonal support rod and lay down the lifting rod.

4.Unloading the load, removing the pull rope hook, then hanging the closing lock hook and tightening the closing lock, etc.

9. Maintenance and Care

1.After using the lifting rod for spraying, it should be dried before being lowered to the closed position.

2.When the lifting rod is closed and placed in the open, it should be covered with a protective cloth cover to prevent rain and dust from entering.

3.If not used for a long time, raise and dry once every half month during the rainy season; once every month during the non-rainy season.

4.After a strong wind in the field or every month, check the setting of the lifting rod which has been set up for a long time, the rod body should not be tilted, deformed, relaxation is not allowed, and problems should be eliminated in time.



Product address:http://m.25561.cn/en/bileiz/1611.html
Hello, my friend!
What kind of support do you need? Our products is sure to satisfy you.
*Name
*Email
WeChat
Phone
Country
*Message
主站蜘蛛池模板: 女人18毛片免费视频播放 | 亚洲精品ai换脸一区二区三区 | 色护士综合 | 手机看片福利盒子久久 | 在线观看欧美 | 日韩一级片免费在线观看 | 久久都是精品 | 怡红院亚洲色图 | 情侣视频精品免费的国产 | 亚洲精品老司机综合影院 | 欧美日韩精品在线播放 | 99久久精品国产综合男同 | 中文字幕一区二区三区在线播放 | 2017天天爽夜夜爽精品视频 | 成人精品亚洲 | 91久久麻豆 | 久久精品老司机 | 国产亚洲精品久久久极品美女 | 99色吧| 国产三级日产三级韩国三级 | 免费网页| 午夜影院在线免费 | 亚洲一区毛片 | 国产免费a v吧在线观看不卡 | 日本免费一区二区三区看片 | 日日爱669| 成人交性视频免费看 | 欧美 日本 | 久久久国产99久久国产一 | 国产精品久久久免费视频 | 四虎精品视频在线永久免费观看 | 久久国产精品视频一区 | 日韩一级片播放 | 99精品国产高清一区二区三区香蕉 | 婷婷亚洲久悠悠色在线播放 | 国产欧美日韩成人 | 日本午夜视频 | 欧美亚洲免费久久久 | 国产三级全黄 | 国产精品久久久久三级 | 亚洲免费精品视频 |